Samsung Electronics and SK hynix have declined a proposed prepayment of approximately KRW25 trillion, or about $18.7 billion, for electricity costs, DigiTimes reports. The proposal was tied to South Korea’s effort to accelerate semiconductor expansion and ensure that new manufacturing sites have adequate power infrastructure. Power availability is a practical constraint on memory capacity because advanced fabs need large, reliable energy supplies long before wafers can enter volume production. The companies’ response does not change current DRAM or HBM output, but it illustrates how financing infrastructure can influence the pace of future expansion. The report does not provide a revised funding mechanism or construction timeline.
Supply Chain · Sep 18, 2026
Samsung and SK hynix Decline Proposed Power Prepayment for Korean Chip Expansion
Samsung Electronics and SK hynix have rejected a proposal to prepay roughly KRW25 trillion for electricity, according to DigiTimes. The decision highlights the funding challenge of building the power infrastructure needed for semiconductor capacity growth.
Price impact: 1Direction: upSource: DigiTimes Daily
Samsung ElectronicsSK hynixDRAMHBMsemiconductor manufacturing
Original sourceBack to news archive